CoreElement.AI › Blog › What a cost-per-metre assumption excludes
ECONOMICS

What a cost-per-metre assumption excludes

November 7, 2026 · Core Element editorial team · 5 min read
Abstract geology illustration for: What a cost-per-metre assumption excludes

A cost-per-metre figure is a ratio, and what it means depends on where its cost boundary sits. This explainer covers what the numerator can leave out and what to ask before relying on it.

A cost-per-metre figure looks like a single number, but it is a ratio with a hidden boundary. This explainer covers what that boundary can leave out. It uses a published government cost framework as a reference point. None of the cited sources, as reviewed, defines cost per metre for mineral drilling. Definitions and checks below are therefore labelled as the editorial team view unless a source is cited.

What the term means

Editorial team view: cost per metre is the total cost assigned to a drilling programme divided by the metres drilled. It is expressed in a stated currency per metre (currency/m). The denominator is often simpler to check than the numerator, but its unit and what it counts should still be confirmed. The numerator depends on three choices: which costs were included, when cost accumulation started and stopped, and how shared costs were split between programmes.

A documented cost boundary as a reference

Canadian guidance on allowable expenditures for petroleum exploration licences shows how explicitly such a boundary can be drawn. It records a shift from set activity rates to actual cost for licences issued from 2002. It is a claims framework for a different sector, and the editorial team does not treat it as a standard for mineral drilling. Under that guidance:

The guidance says the approach is not intended to cover every cost an explorer incurs, but rather a high percentage that can act as "a close proxy for the full cost". In this framework, an item that is not eligible at cost is not necessarily left out. Some items are recognised only through the flat allowance.

Why it matters for a decision

Editorial team view: some costs do not scale with metres drilled, such as mobilization, standby, staging, access and approvals. When these are included, they are spread over however many metres were drilled. Two programmes paying the same contracted rate can therefore show very different all-in figures. A contractor rate alone can also understate programme cost if fixed items are recorded elsewhere. Figures can only be compared across programmes, years or contractors when, at a minimum, their boundaries, allocation rules and currency basis match.

How it can be misread

Editorial team view: the editorial team suggests checking for the following possible misreadings. They are not drawn from the cited sources.

USGS describes reserves as only those resources that can be economically recovered under current market conditions. Editorial team view: a drilling cost ratio does not, on its own, address that economic test.

Questions to ask before relying on it

USGS data management guidance says data from outside sources should be assessed for quality before use. It also says parameter-level standards define the format and units of a field. The questions below are the editorial team's suggestions, not USGS requirements.

  1. What currency, tax basis and unit are used: metres drilled, or another measure?
  2. When did cost accumulation start and stop?
  3. Are mobilization, demobilization and standby included, and how were shared costs allocated?
  4. Are access, approvals, staging, supervision, interpretation and financing in or out, and are any of them covered only by a flat allowance?
  5. Is the figure an actual cost, a budget or a contracted rate?
  6. Is the boundary documented next to the figure so that someone else can reproduce it?

Limitations

The main cost source is Canadian petroleum licence guidance, not a mineral drilling standard, and the sections of it reviewed here do not mention cost per metre. The cited sources, as reviewed, give no typical cost-per-metre values, ranges or ratios, so this article gives none. The checklist describes reasoning only. It is not advice on any programme, contract or purchase, and qualified professionals should check how it applies in each case.

Sources

NEXT STEP

Send an inventory first. Use an agreed secure route for confidential files, coordinates and raw project data. Contact Core Element to discuss your data inventory.